“Improving Energy Governance in the Cement Industry: OPTUNA-BILSTM Framework for Long-Range Electrical Load Forecasting”. 2026. ITEGAM-JETIA 12 (60): 1101-7. https://doi.org/10.5935/jetia.v12i61.3982.