[1]
2026. Improving Energy Governance in the Cement Industry: OPTUNA-BILSTM Framework for Long-Range Electrical Load Forecasting. ITEGAM-JETIA. 12, 60 (ago. 2026), 1101–1107. DOI:https://doi.org/10.5935/jetia.v12i61.3982.