Improving Energy Governance in the Cement Industry: OPTUNA-BILSTM Framework for Long-Range Electrical Load Forecasting. (2026). ITEGAM-JETIA, 12(60), 1101-1107. https://doi.org/10.5935/jetia.v12i61.3982