«Improving Energy Governance in the Cement Industry: OPTUNA-BILSTM Framework for Long-Range Electrical Load Forecasting» (2026) ITEGAM-JETIA, 12(60), pp. 1101–1107. doi:10.5935/jetia.v12i61.3982.