Modifications to automation project of a Hyundai genset in Cayo Santa Maria
Abstract
The paper presents the integration of one battery of Hyundai Engines 1.7 MW to the isolated system Cayo Santa Maria. Including the adaptation of the automation project, preparation of drawings and panels. Preparation of SCADA, PLC programming and configuration of the communication.